I10 SR8 over Yon Creek

5.2mi. E of Apalach River · County 039, Florida · Built 1978 · 4 Lanes · 23,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
500110
Year Built
1978
Length
13.5 m (44.3 ft)
Max Span
3 m
Lanes
4
Daily Traffic
23,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.