WB Rest Area Ramp over SR8 I10

0.5MI E Apalachee River · County 039, Florida · Built 1978 · 2 Lanes · 850 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
500075
Year Built
1978
Length
56.1 m (184.1 ft)
Max Span
56.1 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
850
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$201,000
Total Project Cost
$201,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.