SR690 over SR690 FLYOVR EB/WB TRANS
3.1Mi West of I-275 · County 103, Florida · Built 2024 · 2 Lanes · 16,963 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
27.879139, -82.708583
This bridge is in worse condition than 26.5% of bridges in County 103. The average bridge in Florida is 0 years old; this one is 2 years old.
Nearby Bridges
US-19 NB over 118TH AVENUE
Built 2008
US-19 SB over 118TH AVENUE
Built 2009
SR 690 over SR 690 FLYOVER EB/WB
Built 2024
SR55 to SR690 Ramp over US19 SB Frontage Road
Built 2024
SR690 W over SR690 W to SR55 N FLYOVR
Built 2024
US-19 SB FRTG RD over CROSS BAYOU CANAL
Built 2021
US-19 SR-55 over CROSS BAYOU CANAL
Built 1990
US-19 NB FRONTAGE over CROSS BAYOU CANAL
Built 2021
SR690 W to SR55 N over Cross Bayou Canal
Built 2023
SR55 to SR690 Ramp over CROSS BAYOU CANAL
Built 2024
Bridge Details
- Structure #
- 150289
- Year Built
- 2024
- Length
- 490.3 m (1608.6 ft)
- Max Span
- 50.3 m
- Width
- 17.9 m (58.7 ft)
- Lanes
- 2
- Daily Traffic
- 16,963
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.