SR55 to SR690 Ramp over US19 SB Frontage Road

3.6Mi West of I-275 · County 103, Florida · Built 2024 · 1 Lanes · 8,563 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
150288
Year Built
2024
Length
162.2 m (532.2 ft)
Max Span
51.1 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
8,563
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.