SR690 W over SR690 W to SR55 N FLYOVR
3.6Mi West of I-275 · County 103, Florida · Built 2024 · 1 Lanes · 8,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
27.881, -82.713778
This bridge is in worse condition than 26.5% of bridges in County 103. The average bridge in Florida is 0 years old; this one is 2 years old.
Nearby Bridges
SR55 to SR690 Ramp over US19 SB Frontage Road
Built 2024
US-19 SB FRTG RD over CROSS BAYOU CANAL
Built 2021
SR55 to SR690 Ramp over CROSS BAYOU CANAL
Built 2024
US-19 SR-55 over CROSS BAYOU CANAL
Built 1990
SR690 W to SR55 N over Cross Bayou Canal
Built 2023
US-19 NB FRONTAGE over CROSS BAYOU CANAL
Built 2021
US-19 SB over 118TH AVENUE
Built 2009
SR 690 over SR 690 FLYOVER EB/WB
Built 2024
US-19 NB over 118TH AVENUE
Built 2008
SR690 over SR690 FLYOVR EB/WB TRANS
Built 2024
Bridge Details
- Structure #
- 150287
- Year Built
- 2024
- Length
- 330.2 m (1083.3 ft)
- Max Span
- 95.3 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 1
- Daily Traffic
- 8,400
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.