I-275 SB over TAMPA BAY MAXIMO POINT

1.7MI SOUTH OF SR-682 · County 103, Florida · Built 1994 · 2 Lanes · 32,608 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
150213
Year Built
1994
Length
866.8 m (2843.8 ft)
Max Span
37.2 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
32,608
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.