US19 SB TO I275 SB over PINELLAS POINT DR SOUTH

0.7MI SOUTH OF SR-679 · County 103, Florida · Built 1987 · 2 Lanes · 8,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
150175
Year Built
1987
Length
37.7 m (123.7 ft)
Max Span
37.7 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
8,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.