SR679EB TO I 275NB over US-19 SR-55 54TH AVE S
INTERSECT US-19 I-275 · County 103, Florida · Built 1984 · 2 Lanes · 12,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
27.719053, -82.678547
This bridge is in worse condition than 26.5% of bridges in County 103. The average bridge in Florida is 0 years old; this one is 42 years old.
Nearby Bridges
I-275 NB over 54TH AVENUE SOUTH
Built 1984
I-275SB TO SR679WB over US-19 SR-55 SR-679
Built 1984
I-275 SB over 54TH AVENUE SOUTH
Built 1984
I-275 SB over I-275 NB & RAMPS
Built 1987
I-275 NB over I275SB & RAMP TO 54 AV S
Built 1983
I-275 NB (US-19) over FRENCHMENS CREEK
Built 1987
I-275 SB (US-19) over FRENCHMENS CREEK
Built 1987
I-275 NB AND RAMP over PEDESTRIAN WALKWAY
Built 1983
I-275 SB over PEDESTRIAN WALKWAY
Built 1983
I-275 SB RAMP over PEDESTRIAN WALKWAY
Built 1983
Bridge Details
- Structure #
- 150187
- Year Built
- 1984
- Length
- 306.6 m (1005.9 ft)
- Max Span
- 68.1 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 12,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $50,000
- Total Project Cost
- $55,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.