SR-590 COACHMAN RD over ALLIGATOR CREEK
0.7MI WEST OF US-19 · County 103, Florida · Built 1927 · 2 Lanes · 13,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
27.977178, -82.738542
This bridge is in worse condition than 26.5% of bridges in County 103. The average bridge in Florida is 0 years old; this one is 99 years old.
Nearby Bridges
OLD COACHMAN ROAD over ALLIGATOR CREEK
Built 1925
US-19 SR-55 over CSX RR/EAST WEST TRAIL
Built 1959
US-19 (SR-55) over ALLIGATOR CREEK
Built 1948
US-19 (SR-55) SB over NE COACHMAN RD
Built 2006
US-19 (SR-55) NB over NE COACHMAN RD
Built 2007
ACCESS ROAD A over POND 4E
Built 2005
ACCESS ROAD A over POND 4D
Built 2005
US-19 (SR-55) over CR-528 (DREW ST.)
Built 2005
US-19 (US-55) SB over SUNSET POINT RD.
Built 2006
US-19 (SR-55) NB over SUNSET POINT RD.
Built 2007
Bridge Details
- Structure #
- 150113
- Year Built
- 1927
- Length
- 11.3 m (37.1 ft)
- Max Span
- 11.3 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 13,100
- Material
- Concrete
- Design
- Arch - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.