US-19 (SR-55) NB over NE COACHMAN RD
1.5 MI N/O SR-60 · County 103, Florida · Built 2007 · 3 Lanes · 53,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
27.982556, -82.729611
This bridge is in worse condition than 26.5% of bridges in County 103. The average bridge in Florida is 0 years old; this one is 19 years old.
Nearby Bridges
US-19 (SR-55) SB over NE COACHMAN RD
Built 2006
US-19 SR-55 over CSX RR/EAST WEST TRAIL
Built 1959
OLD COACHMAN ROAD over ALLIGATOR CREEK
Built 1925
US-19 (US-55) SB over SUNSET POINT RD.
Built 2006
US-19 (SR-55) NB over SUNSET POINT RD.
Built 2007
US-19 (SR-55) over ALLIGATOR CREEK
Built 1948
SR-590 COACHMAN RD over ALLIGATOR CREEK
Built 1927
ACCESS ROAD A over POND 4E
Built 2005
ACCESS ROAD A over POND 4D
Built 2005
FAIRWOOD AVE. over ALLIGATOR CREEK
Built 1975
Bridge Details
- Structure #
- 150247
- Year Built
- 2007
- Length
- 138 m (452.8 ft)
- Max Span
- 65 m
- Width
- 16.9 m (55.4 ft)
- Lanes
- 3
- Daily Traffic
- 53,000
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.