US-19 (SR-55) over CR-528 (DREW ST.)
0.5MI N OF SR-60 · County 103, Florida · Built 2005 · 6 Lanes · 117,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
27.967861, -82.729889
This bridge is in worse condition than 26.5% of bridges in County 103. The average bridge in Florida is 0 years old; this one is 21 years old.
Nearby Bridges
ACCESS ROAD A over POND 4D
Built 2005
ACCESS ROAD A over POND 4E
Built 2005
US-19 (SR-55) over ALLIGATOR CREEK
Built 1948
US-19 (SR-55) over SR-60 (GULF TO BAY BLVD)
Built 2014
US-19 SR-55 over CSX RR/EAST WEST TRAIL
Built 1959
OLD COACHMAN ROAD over ALLIGATOR CREEK
Built 1925
FAIRWOOD AVE. over ALLIGATOR CREEK
Built 1975
SR-590 COACHMAN RD over ALLIGATOR CREEK
Built 1927
US-19 (SR-55) over SEVILLE BLVD.
Built 2014
US-19 (SR-55) SB over NE COACHMAN RD
Built 2006
Bridge Details
- Structure #
- 150226
- Year Built
- 2005
- Length
- 266.3 m (873.7 ft)
- Max Span
- 62.2 m
- Width
- 35.8 m (117.5 ft)
- Lanes
- 6
- Daily Traffic
- 117,000
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.