I-275 NB over TAMPA BAY

2.3 MI W OF SR-60 · County 103, Florida · Built 1959 · 4 Lanes · 83,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
150107
Year Built
1959
Reconstructed
1992
Length
4837.8 m (15872 ft)
Max Span
29.9 m
Width
19 m (62.3 ft)
Lanes
4
Daily Traffic
83,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.