I-275 NB EXIT RAMP over I-275 NB

0.1 MI N/O SR-686 · County 103, Florida · Built 2021 · 3 Lanes · 37,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
150312
Year Built
2021
Length
171.3 m (562 ft)
Max Span
47.2 m
Width
20.6 m (67.6 ft)
Lanes
3
Daily Traffic
37,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.