SR-690 WB EXP RAMP over I-275 SB

0.6MI E/O 28TH ST · County 103, Florida · Built 2023 · 1 Lanes · 13,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
150311
Year Built
2023
Length
296.9 m (974.1 ft)
Max Span
60.9 m
Width
9 m (29.5 ft)
Lanes
1
Daily Traffic
13,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.