SR-690 WB EXP RAMP over I-275 SB
0.6MI E/O 28TH ST · County 103, Florida · Built 2023 · 1 Lanes · 13,600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
27.8775, -82.661111
This bridge is in worse condition than 24.3% of bridges in County 103. The average bridge in Florida is 0 years old; this one is 3 years old.
Nearby Bridges
SR-690 EB over I-275
Built 2024
SR690EB TO I-275NB over I-275 & ROOSEVLT & RMP P
Built 2002
I-275 SB over SR-686 (ROOSEVELT BLVD.)
Built 1970
I-275SB-118TH AVE over ROOSEVELT BLVD & RAMP R
Built 2002
RAMP P over SR 686 (ROOSEVELT BLVD.)
Built 1970
I-275 NB over ROOSEVELT BLVD
Built 2021
ROOSEVELT BYPASS over ROOSEVELT BLVD. (SR-686)
Built 2010
I-275 NB EXIT RAMP over I-275 NB
Built 2021
I-275 TO 118TH N over 28TH ST
Built 2002
118 AVE N TO I-275 over 28TH STREET
Built 2002
Bridge Details
- Structure #
- 150311
- Year Built
- 2023
- Length
- 296.9 m (974.1 ft)
- Max Span
- 60.9 m
- Width
- 9 m (29.5 ft)
- Lanes
- 1
- Daily Traffic
- 13,600
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.