4TH STREET RAMP over I -275 (SR-93)
1.9MI NE OF SR-686 · County 103, Florida · Built 2023 · 1 Lanes · 8,600 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
27.900236, -82.638897
This bridge is in worse condition than 26.5% of bridges in County 103. The average bridge in Florida is 0 years old; this one is 3 years old.
Nearby Bridges
I-275 over BIG ISLAND GAP
Built 2004
SR 687/4th Street over Big Island Gap
Built 2023
SR 687/4th Street over Big Island Gap
Built 2023
SR688 EB TO I275NB over I-275
Built 2004
SR-688 EB over RAMP F I-275 SB TO 9TH
Built 2004
RAMP F (9TH ST N) over I-275
Built 2004
I-275 NB EXIT RAMP over I-275 NB
Built 2021
RAMP P over SR 686 (ROOSEVELT BLVD.)
Built 1970
I-275 NB over ROOSEVELT BLVD
Built 2021
I-275SB-118TH AVE over ROOSEVELT BLVD & RAMP R
Built 2002
Bridge Details
- Structure #
- 150314
- Year Built
- 2023
- Length
- 166.4 m (545.9 ft)
- Max Span
- 89 m
- Width
- 13.1 m (43 ft)
- Lanes
- 1
- Daily Traffic
- 8,600
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.