WB OVERPASS ROAD over I-75 (SR-93)

2.5MI NORTH OF SR-54 · County 101, Florida · Built 2022 · 2 Lanes · 12,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
140162
Year Built
2022
Length
107.5 m (352.7 ft)
Max Span
49.8 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
12,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.