I-75 SB over SR-52

6.7 MI N/O CR-54 · County 101, Florida · Built 2016 · 4 Lanes · 32,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
140137
Year Built
2016
Length
51.2 m (168 ft)
Max Span
51.2 m
Width
31.4 m (103 ft)
Lanes
4
Daily Traffic
32,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.