SR-52 over BAYOU BRANCH
1.2MI EAST OF I-75 · County 101, Florida · Built 2022 · 4 Lanes · 17,100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
28.325389, -82.304389
This bridge is in worse condition than 42% of bridges in County 101. The average bridge in Florida is 0 years old; this one is 4 years old.
Nearby Bridges
PASCO ROAD over STANLEY BRANCH
Built 1965
SR-52 over Drainage Culvert CD-4
Built 2021
I-75 NB (SR-93) over SR-52
Built 2017
I-75 SB over SR-52
Built 2016
I-75 NB (SR-93) over Ossie Murphy Road
Built 2017
I-75 SB over OSSIE MURPHY RD
Built 2016
I-75 (SR-93) over STANLEY BRANCH
Built 1965
CURLEY RD (CR-577) over RENEES CREEK
Built 1956
CR-577 over DITCH
Built 2021
FUTURE SR-52 over DITCH
Built 2021
Bridge Details
- Structure #
- 140157
- Year Built
- 2022
- Length
- 14 m (45.9 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 17,100
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.