SR-56 WB over CABBAGE SWAMP

1.5 MILES EAST OF I-75 · County 101, Florida · Built 2002 · 3 Lanes · 76,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
140121
Year Built
2002
Length
61 m (200.1 ft)
Max Span
30.5 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
76,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.