I-75 (SR-93) over CABBAGE SWAMP CREEK

0.5MI N OF SR-56 · County 101, Florida · Built 1965 · 8 Lanes · 127,007 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
140047
Year Built
1965
Reconstructed
2000
Length
11.9 m (39 ft)
Max Span
3.8 m
Lanes
8
Daily Traffic
127,007
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.