I-75/I-275NBtoSR56 over CYPRESS CREEK

0.8 MI S OF SR-56 · County 101, Florida · Built 2011 · 2 Lanes · 25,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
140135
Year Built
2011
Length
47.5 m (155.8 ft)
Max Span
15.8 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
25,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.