I-275 NB TO I-75NB over I-75 (SR-93)

2MI S OF SR-54 · County 057, Florida · Built 1982 · 2 Lanes · 66,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100411
Year Built
1982
Length
136.7 m (448.5 ft)
Max Span
45.7 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
66,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.