I-275 NB to SR-56 over I-75

2 MILES SOUTH OF SR-54 · County 057, Florida · Built 2010 · 1 Lanes · 12,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
100833
Year Built
2010
Length
142.7 m (468.2 ft)
Max Span
76.2 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
12,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.