I-75 SB & RAMP B over BUFFALO CANAL

800FT. SOUTH OF I-275 · County 081, Florida · Built 1981 · 5 Lanes · 50,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
130108
Year Built
1981
Length
33.5 m (109.9 ft)
Max Span
9.3 m
Width
26.2 m (86 ft)
Lanes
5
Daily Traffic
50,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.