I-275SB TO I-75NB over I-75 AND I-275 RAMPS

0.6 MI EAST OF US-41 · County 081, Florida · Built 1981 · 1 Lanes · 9,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
130112
Year Built
1981
Reconstructed
2019
Length
685.5 m (2249 ft)
Max Span
76.5 m
Width
11.7 m (38.4 ft)
Lanes
1
Daily Traffic
9,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$92,000
Total Project Cost
$97,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.