I-75 SB (SR-93) over MOCCASIN WALLOW ROAD

1.0MI. N OF I-275 · County 081, Florida · Built 1980 · 3 Lanes · 40,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
130078
Year Built
1980
Reconstructed
2003
Length
86.9 m (285.1 ft)
Max Span
30 m
Width
18.2 m (59.7 ft)
Lanes
3
Daily Traffic
40,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.