I-75 SB (SR-93) over MOCCASIN WALLOW ROAD
1.0MI. N OF I-275 · County 081, Florida · Built 1980 · 3 Lanes · 40,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
27.601319, -82.503072
This bridge is in worse condition than 69% of bridges in County 081. The average bridge in Florida is 0 years old; this one is 46 years old.
Nearby Bridges
I-75 NB (SR-93) over MOCCASIN WALLOW ROAD
Built 1980
I-275 NB over I-75
Built 1981
I-275SB TO I-75NB over I-75 AND I-275 RAMPS
Built 1981
I-75 (SR-93) NB over BUFFALO CANAL
Built 1981
I-75 SB & RAMP B over BUFFALO CANAL
Built 1981
BUFFALO ROAD over BUFFALO CANAL
Built 1980
I-275 NB RAMP over BUFFALO CANAL
Built 1981
CR-683 over I-275/SR-93
Built 1983
69TH ST E over I-75
Built 1980
CR683/E GILLETTERD over BUFFALO CANAL
Built 1984
Bridge Details
- Structure #
- 130078
- Year Built
- 1980
- Reconstructed
- 2003
- Length
- 86.9 m (285.1 ft)
- Max Span
- 30 m
- Width
- 18.2 m (59.7 ft)
- Lanes
- 3
- Daily Traffic
- 40,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.