I-75 NB (SR-93) over CALOOSAHATCHEE RIVER

0.6MI NORTH OF SR-80 · County 071, Florida · Built 1976 · 4 Lanes · 94,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
120084
Year Built
1976
Reconstructed
2015
Length
1190 m (3904.2 ft)
Max Span
51.6 m
Width
21.5 m (70.5 ft)
Lanes
4
Daily Traffic
94,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$106,000
Total Project Cost
$121,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.