I-75 SB (SR-93) over POPASH CREEK

0.1Mi. S of SR-78 · County 071, Florida · Built 1978 · 3 Lanes · 47,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
120100
Year Built
1978
Reconstructed
2015
Length
123.7 m (405.8 ft)
Max Span
9.8 m
Width
24.6 m (80.7 ft)
Lanes
3
Daily Traffic
47,250
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.