I-75 NB (SR-93) over TIDAL CREEK

1.0MI SOUTH OF SR-78 · County 071, Florida · Built 1977 · 4 Lanes · 47,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
120082
Year Built
1977
Reconstructed
2015
Length
43.6 m (143 ft)
Max Span
15.2 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
47,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.