I-75 NB over CR-574 & CSX RR

3.1MI N OF SR-60 · County 057, Florida · Built 1983 · 3 Lanes · 71,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100436
Year Built
1983
Reconstructed
2024
Length
109.8 m (360.2 ft)
Max Span
27.8 m
Width
21.2 m (69.6 ft)
Lanes
3
Daily Traffic
71,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.