I-75 SB over CR-574 AND CSX RR

3.1MI N OF SR-60 · County 057, Florida · Built 1983 · 3 Lanes · 71,750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100435
Year Built
1983
Reconstructed
2024
Length
109.7 m (359.9 ft)
Max Span
27.7 m
Width
21.5 m (70.5 ft)
Lanes
3
Daily Traffic
71,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.