SR-574 (MLK) EB over I-75 (SR-93)

2.3MI EAST OF US-301 · County 057, Florida · Built 1984 · 5 Lanes · 44,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
100427
Year Built
1984
Length
86.9 m (285.1 ft)
Max Span
44 m
Width
31.1 m (102 ft)
Lanes
5
Daily Traffic
44,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.