US-41 SB (SR-45) over BULLFROG CREEK

1.5 MI SOUTH ALAFIA RIVER · County 057, Florida · Built 1960 · 2 Lanes · 40,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100044
Year Built
1960
Reconstructed
1986
Length
61.8 m (202.8 ft)
Max Span
7 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
40,500
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$217,000
Total Project Cost
$239,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.