I-75 SB over SYMMES ROAD

3 MILES NORTH OF CR-672 · County 057, Florida · Built 1983 · 3 Lanes · 68,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
100375
Year Built
1983
Length
50.4 m (165.4 ft)
Max Span
27.2 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
68,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.