I-75 NB over BULLFROG CREEK

0.7 MI NORTH OF SYMMES RD · County 057, Florida · Built 1983 · 3 Lanes · 68,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100374
Year Built
1983
Length
126.4 m (414.7 ft)
Max Span
21 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
68,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.