INDEPENDENCE AVENU over TIDAL BASIN

North end of Tidal Basin. · County 001, District of Columbia · Built 1943 · 3 Lanes · 8,970 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
3400032P0000000
Year Built
1943
Reconstructed
1982
Length
190 m (623.4 ft)
Max Span
12.7 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
8,970
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$3,020,000
Total Project Cost
$4,530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.