14TH STREET S.W. over MAINE AVENUE S.W.

14TH ST OVER MAINE AVE SW · County 001, District of Columbia · Built 1942 · 6 Lanes · 35,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
0171-1
Year Built
1942
Reconstructed
1982
Length
105.2 m (345.1 ft)
Max Span
13.7 m
Width
26.5 m (86.9 ft)
Lanes
6
Daily Traffic
35,000
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000,000
Total Project Cost
$5,250,000