GWMP over BOUNDARY CHANNEL

0.3 MILES NORTH OF I-395. · County 001, District of Columbia · Built 2012 · 4 Lanes · 33,452 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
3300020P0000000
Year Built
2012
Length
74.4 m (244.1 ft)
Max Span
32.9 m
Width
27.5 m (90.2 ft)
Lanes
4
Daily Traffic
33,452
Material
Prestressed Concrete
Design
Arch - Deck
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$23,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.