SHIRLEY MEM.HIWAY over BOUNDARY CHANNEL DRIVE

0.38FR110/0.31TO14ST.BR. · County 013, Virginia · Built 1950 · 13 Lanes · 126,751 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000250
Year Built
1950
Length
22.6 m (74.1 ft)
Max Span
22.6 m
Width
59.5 m (195.2 ft)
Lanes
13
Daily Traffic
126,751
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$157,000,000
Total Project Cost
$192,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.