SBL ROUTE I-395 over RTE.110 JEFF.DAVIS HWY.

00.63FR27/00.62TO14 ST BR · County 013, Virginia · Built 1976 · 4 Lanes · 50,531 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000000283
Year Built
1976
Length
77.4 m (253.9 ft)
Max Span
38.7 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
50,531
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$230,000,000
Total Project Cost
$260,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.