TR BRIDGE(RAMPC) over INNER LOOP

TR BR RAMP C & INNER · County 001, District of Columbia · Built 1964 · 1 Lanes · 17,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1205
Year Built
1964
Length
75.4 m (247.4 ft)
Max Span
30.2 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
17,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,250,000
Total Project Cost
$1,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.