T.R. Bridge Ramp over INNER LOOP

NEAR 23RD & KENN CENT · County 001, District of Columbia · Built 1964 · 2 Lanes · 16,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1204
Year Built
1964
Length
121.1 m (397.3 ft)
Max Span
26.2 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
16,000
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,250,000
Total Project Cost
$1,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.