TR BRIDGE(RAMP A) over INNER LOOP

TR BR RAMP&INNER LOOP · County 001, District of Columbia · Built 1964 · 2 Lanes · 13,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1201
Year Built
1964
Length
50.3 m (165 ft)
Max Span
17.4 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
13,400
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,750,000
Total Project Cost
$2,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.