Ramp T over Anacostia Freeway

Malcolm X Interchange · County 001, District of Columbia · Built 2021 · 2 Lanes · 650 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1035
Year Built
2021
Length
58 m (190.3 ft)
Max Span
58 m
Width
18 m (59.1 ft)
Lanes
2
Daily Traffic
650
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.