Ramp T over Anacostia Freeway
Malcolm X Interchange · County 001, District of Columbia · Built 2021 · 2 Lanes · 650 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
38.843547, -77.00785
This bridge is in worse condition than 2.7% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 5 years old.
Nearby Bridges
I-295 Access Road over Ramp J
Built 2022
ANACOSTIA FREEWAY over Malcom X. Avenue
Built 1963
MALCOM X AVENUE over SOUTH CAPITOL STREET
Built 1943
ANACOSTIA FREEWAY over Malcom X. Avenue
Built 1963
Malcolm X Avenue over I-295 Access Road
Built 2021
I-295 Access over Ramp G
Built 2021
ANACOSTIA FREEWAY over S.CAPITOL ST S.E.
Built 1963
ANACOSTIA FREEWAY over S. Capitol Street S.E.
Built 1963
Ramp F over Ramp E
Built 2021
SB I-295 Exit Ramp over SOUTH CAPITOL ST S.E.
Built 1962
Bridge Details
- Structure #
- 1035
- Year Built
- 2021
- Length
- 58 m (190.3 ft)
- Max Span
- 58 m
- Width
- 18 m (59.1 ft)
- Lanes
- 2
- Daily Traffic
- 650
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.