SB I-295 Exit Ramp over SOUTH CAPITOL ST S.E.
ANACOSTIA FRWY & S.CA · County 001, District of Columbia · Built 1962 · 2 Lanes · 13,800 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.85035, -77.007836
This bridge is in worse condition than 34.5% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 64 years old.
Nearby Bridges
I-295 Access over Ramp G
Built 2021
MALCOM X AVENUE over SOUTH CAPITOL STREET
Built 1943
ANACOSTIA FREEWAY over Malcom X. Avenue
Built 1963
ANACOSTIA FREEWAY over Malcom X. Avenue
Built 1963
Malcolm X Avenue over I-295 Access Road
Built 2021
I-295 Access Road over Ramp J
Built 2022
Ramp T over Anacostia Freeway
Built 2021
ANACOSTIA FREEWAY over S.CAPITOL ST S.E.
Built 1963
ANACOSTIA FREEWAY over FIRTH STERLING AVE
Built 2022
ANACOSTIA FREEWAY over S. Capitol Street S.E.
Built 1963
Bridge Details
- Structure #
- 1015
- Year Built
- 1962
- Reconstructed
- 2007
- Length
- 32.9 m (107.9 ft)
- Max Span
- 29.8 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 13,800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,500,000
- Total Project Cost
- $2,150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.