ANACOSTIA FREEWAY over S. Capitol Street S.E.
ANACOSTIA FRWY OVER S.CAP · County 001, District of Columbia · Built 1963 · 2 Lanes · 104,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.838472, -77.008869
This bridge is in worse condition than 5.7% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 63 years old.
Nearby Bridges
Ramp F over Ramp E
Built 2021
ANACOSTIA FREEWAY over S.CAPITOL ST S.E.
Built 1963
Ramp T over Anacostia Freeway
Built 2021
I-295 Access Road over Ramp J
Built 2022
MALCOM X AVENUE over SOUTH CAPITOL STREET
Built 1943
Malcolm X Avenue over I-295 Access Road
Built 2021
ANACOSTIA FREEWAY over Malcom X. Avenue
Built 1963
ANACOSTIA FREEWAY over Malcom X. Avenue
Built 1963
I-295 Access over Ramp G
Built 2021
4TH ST.S.E. over OXON RUN
Built 1960
Bridge Details
- Structure #
- 1016(NB)
- Year Built
- 1963
- Reconstructed
- 2019
- Length
- 32.6 m (107 ft)
- Max Span
- 15.6 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 2
- Daily Traffic
- 104,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $750,000
- Total Project Cost
- $1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.