4TH ST.S.E. over OXON RUN
4TH ST S.E.OVER OXON RUN · County 001, District of Columbia · Built 1960 · 2 Lanes · 4,035 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
38.833956, -77.000536
This bridge is in worse condition than 34.5% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 66 years old.
Nearby Bridges
ATLANTIC STREET over OXON RUN
Built 1953
WHEELER ROAD S.E. over OXON RUN
Built 1950
Ramp F over Ramp E
Built 2021
ANACOSTIA FREEWAY over S. Capitol Street S.E.
Built 1963
ANACOSTIA FREEWAY over S.CAPITOL ST S.E.
Built 1963
Ramp T over Anacostia Freeway
Built 2021
S. CAPITOL STREET over OXON RUN
Built 1941
I-295 Access Road over Ramp J
Built 2022
IRVINGTON STREET over BARNABY RUN
Built 1958
Malcolm X Avenue over I-295 Access Road
Built 2021
Bridge Details
- Structure #
- 0060
- Year Built
- 1960
- Reconstructed
- 2003
- Length
- 19.5 m (64 ft)
- Max Span
- 18.9 m
- Width
- 16.6 m (54.5 ft)
- Lanes
- 2
- Daily Traffic
- 4,035
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000,000
- Total Project Cost
- $1,250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.