I-95 NB EXIT 8 OFF over ATLANTIC STREET

I-95 NB EXIT 8 OFF RAMP · County 001, Connecticut · Built 2015 · 1 Lanes · 10,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
06873
Year Built
2015
Length
33.2 m (108.9 ft)
Max Span
31.7 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
10,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.