SR 790 (SOUTH STAT over RIPPOWAM RIVER

NEAR EXIT 7 I-95 NB · County 001, Connecticut · Built 1847 · 2 Lanes · 5,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
03682
Year Built
1847
Reconstructed
2022
Length
36 m (118.1 ft)
Max Span
9.1 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
5,700
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$4,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.