I-95 & I-95 RAMP 0 over GREENWICH AVE RIPPOWAM

INTERSTATE-95 EXIT NO. 7 · County 001, Connecticut · Built 1958 · 7 Lanes · 122,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00026
Year Built
1958
Reconstructed
1990
Length
132.7 m (435.4 ft)
Max Span
22.9 m
Width
33.5 m (109.9 ft)
Lanes
7
Daily Traffic
122,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.